Woodford County Highway Department Building

Construction Manager Role: MCP was engaged as the construction manager for the construction of a new highway department building. The involvement of MCP extended beyond traditional construction management, encompassing pre-design and planning services, along with assisting the county in selecting an architect. Comprehensive Pre-Construction and Procurement Services: In the capacity of the construction manager, MCP […]

Washington Township Building

Owner’s Representative Role: MCP assumed the role of Owner’s Representative, collaborating closely with Washington Township on the planning and conceptual design of their new township building. This involved hands-on coordination with the design team from Farnsworth. Comprehensive Construction Management: As the appointed construction manager, MCP took charge of all pre-construction and procurement services. This encompassed […]

Bureau Valley Wyanet Elementary School

Background: Bureau Valley Wyanet Elementary School underwent a significant transformation as part of a broader district-wide bond referendum, which included three construction projects. The entire initiative was led by MCP, successfully guiding the 25+ member referendum committee. Scope of Impact: The project had a substantial impact on the majority of the existing school infrastructure. Recognizing […]

Bureau Valley Walnut Elementary School

Background: Bureau Valley Walnut Elementary School underwent a transformative redevelopment as part of a district-wide bond referendum, with MCP successfully spearheading the comprehensive effort and leading the 25+ member referendum committee. Scale of the Project: Distinguished by its magnitude, the Walnut Elementary School project was three times larger than the simultaneous endeavor at Wyanet Elementary […]

Sam Leman Auto Group – Morton

MCP provided construction management services during the planning, pre-construction, and construction phases for the new Chrysler, Dodge, Jeep, Ram dealership. In order to fast-track the project, we had three (3) bid phases, this enabled us to start site improvements, foundations, and procure the long lead-time items such as the precast concrete wall panels and steel. […]

Culvers – Peoria

MCP provided a major interior and exterior renovation of the existing Culvers restaurant. The scope included new walls, painting, flooring, ceilings, light fixtures, plumbing fixtures, toilet partitions and accessories, and new kitchen equipment. We also completed the installation of the new benches, seating, and artwork. The work started on a Sunday afternoon and was completed […]

Potbelly – East Peoria

Franchise Collaboration: Jeff Ackerman, a new franchise owner for Potbelly, engaged MCP by inviting them to submit a competitive bid as the general contractor for their new store in East Peoria. Selection Based on Relationship and Trust: Despite not being the lowest bidder, Jeff Ackerman chose MCP for the construction based on the trust and […]

Toyota of Bloomington

MCP provided construction management services during the planning, pre-construction, and construction phases for the new Toyota dealership. In order to fast-track the project, we had three (3) bid phases, this enabled us to start site improvements, foundations, and procure the long lead-time items such as the precast concrete wall panels and steel. We developed, competitively […]

Buffalo Wild Wings – Normal

MCP acted as a CM at Risk for this project. The overall project included site demolition, site improvements, and a new building. Built in conjunction with the BWW was 4-story building, which included BWW on the 1 st floor and then 3 floors of student apartments totaling nearly 30,000 sf. We had multiple bid packages […]

Metamora High School Stadium

Client’s Initiative and Initial Challenges: Metamora Township High School (MTHS), a recurring client of MCP, initially explored options for turf installation by engaging with multiple turf companies. The proposals received varied significantly in terms of costs, scope of work, types of turf, alternate options, and exclusions, presenting a complex decision-making challenge. MCP’s Role and JOC […]