Bureau Valley Wyanet Elementary School HVAC & Electrical Upgrades

Project Information

Client

Bureau Valley CUSD #340

Location

Wyanet, Illinois

MCP's Role

Construction Manager as Agent

Project Type

HVAC and Electrical Upgrades

Project Size

20,425 SF

Architect

Larson & Darby

Project Information

Client

Bureau Valley CUSD #340

MCP's Role

Construction Manager as Agent

Project Size

20,425 SF

Location

Wyanet, Illinois

Project Type

HVAC and Electrical Upgrades

Architect

Larson & Darby

Bureau Valley Wyanet Elementary School

Background:
Bureau Valley Wyanet Elementary School underwent a significant transformation as part of a broader district-wide bond referendum, which included three construction projects. The entire initiative was led by MCP, successfully guiding the 25+ member referendum committee.

Scope of Impact:
The project had a substantial impact on the majority of the existing school infrastructure. Recognizing the need for modernization, particular emphasis was placed on addressing the HVAC and electrical systems.

Mechanical Upgrades:
The existing mechanical systems were deemed inadequate and outdated, prompting a comprehensive overhaul. The project involved the installation of all-new mechanical rooftop units, ensuring optimal efficiency and functionality.

Electrical Enhancement:
A major electrical upgrade was implemented, encompassing the installation of a new electrical service to meet the evolving needs of the school. This was a critical component in enhancing overall safety and energy efficiency.

Interior Renovations:
To create a more conducive learning environment, extensive renovations were carried out, including new ceilings and lighting throughout the school. These updates not only improved aesthetics but also contributed to a more modern and comfortable atmosphere for students and staff.

Project Management:
MCP efficiently managed the project by overseeing two prime contractors. The coordination and supervision of both the HVAC and electrical upgrades were conducted seamlessly to ensure the successful execution of the entire project.

Summer Timeline:
All work on Bureau Valley Wyanet Elementary School was strategically completed during the summer months, minimizing disruption to the academic calendar. This timeline was crucial to the project’s success, allowing for a swift and efficient implementation of the upgrades.

Collaborative Efforts:
The strategic proximity of Wyanet to Bureau Valley High School, another project under MCP’s management, presented an opportunity for cost savings. By utilizing the same project team, comprised of a dedicated project manager and superintendent, MCP streamlined operations and maximized efficiency.

Simultaneous Projects:
In a remarkable display of project management prowess, MCP concurrently handled the HVAC and Electrical Upgrade project at Walnut Elementary School, located fifteen miles from both Manlius and Wyanet. This dual-project approach, facilitated by the shared MCP team, exemplifies the efficiency and effectiveness of MCP’s comprehensive construction management capabilities.

The Bureau Valley Wyanet Elementary School project stands as a testament to MCP’s commitment to excellence, collaborative project management, and the successful execution of complex construction initiatives within educational institutions.

Project Gallery

Have a project?

Send us your project info

Similar Projects

Woodford County Highway Department Building

Construction Manager Role: MCP was engaged as the construction manager for the construction of a new highway department building. The...

Washington Township Building

Owner’s Representative Role: MCP assumed the role of Owner’s Representative, collaborating closely with Washington Township on the planning and conceptual...

Bureau Valley Walnut Elementary School

Background: Bureau Valley Walnut Elementary School underwent a transformative redevelopment as part of a district-wide bond referendum, with MCP successfully...

Sam Leman Auto Group – Morton

MCP provided construction management services during the planning, pre-construction, and construction phases for the new Chrysler, Dodge, Jeep, Ram dealership....